DZone
In The Need For Speed survey, we asked over 2400 developers what’s hard about Fast Data through the lens of the complete project lifecycle: Design, Build, and Run.
The responses were roughly split between the build and run phases of a project. The design phase, however, appears most problematic with choosing the right tools ranking as the top challenge.
Source: DZone